Original Industrial Spare Part

Novellus 16-167627-00 Service-Ready Industrial Spare Part

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: 16-167627-00 8122 410 05002, 4022.470.78191 8122 410 55702 16-273491-00 PLC & Industrial Automation Modules NOVELLUS

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

Novellus 16-167627-00 Service-Ready Industrial Spare Part: Minimizing Downtime in PECVD Process Systems

The Novellus 16-167627-00 is a ruggedized filter module engineered for demanding semiconductor and industrial process environments. Designed to operate within Novellus C3 Vector PECVD (Plasma-Enhanced Chemical Vapor Deposition) systems, this component plays a critical role in maintaining process gas purity, protecting downstream instrumentation, and ensuring stable deposition performance across extended production cycles. As an original spare part sourced and pre-shipment tested by NINERMAS, the 16-167627-00 is available for immediate dispatch to maintenance teams, system integrators, and procurement engineers managing legacy CVD tool fleets worldwide.

Unplanned downtime in PECVD environments carries significant cost — both in lost wafer throughput and in the cascading risk of contamination events. Maintaining a service-ready inventory of the Novellus 16-167627-00 filter module is a foundational step in any proactive maintenance strategy for C3 Vector or compatible process chambers.

Spare Maintenance Table

Parameter Specification / Detail
Part Number 16-167627-00
Brand Novellus Systems (Lam Research)
Series / Platform C3 Vector PECVD System
Component Type Ruggedized Filter Module
Application Process gas filtration, particle exclusion, downstream instrument protection
Operating Environment Harsh semiconductor fab environment; high-purity gas handling
Compatibility Novellus C3 Vector, compatible PECVD chamber configurations
Cross-Reference SKUs 8122 410 05002 / 4022.470.78191 / 8122 410 55702 / 16-273491-00
Installation Direct OEM replacement; no modification required for compatible platforms
Condition Original spare; pre-shipment tested
Warranty 12 Months — NINERMAS Standard Warranty
Lead Time In-stock; same-day or next-business-day dispatch available
Origin United States

Maintenance Planning for Continuous Operation

When scheduling replacement of the Novellus 16-167627-00 filter module during a planned or emergency maintenance window, experienced process engineers consistently identify a set of adjacent components that should be inspected or replaced concurrently to maximize system uptime and avoid repeat call-outs.

The gas delivery subsystem surrounding this filter module typically includes mass flow controllers (MFCs) — such as the Novellus 16-167628-00 or equivalent Brooks/MKS units — which regulate precursor and carrier gas flows into the chamber. A clogged or degraded filter module places upstream backpressure stress on these MFCs, accelerating wear on their internal valve seats. Inspecting MFC calibration and zero-flow integrity during the same maintenance window is strongly recommended.

Downstream of the filter, process gas panel valves and pneumatic actuators (including Novellus-series solenoid valve assemblies) should be checked for seat wear and leak-by, particularly if the filter has been operating beyond its recommended service interval. Contamination that bypasses a degraded filter can deposit on valve seats and cause intermittent process faults that are difficult to isolate.

The RF power delivery chain — including the RF match network, RF generator interface board, and associated coaxial cabling — should be verified for impedance stability after any chamber maintenance event. Particulate contamination events linked to filter degradation can alter chamber impedance characteristics, causing the RF match to hunt or fault. Novellus RF match assemblies and generator interface cards (such as the 16-167626-00 power module series) are common co-replacement items in C3 Vector PM kits.

The chamber backplane and I/O interface cards that manage sensor inputs, interlock logic, and process recipe execution should be inspected for contamination ingress and connector integrity. In harsh fab environments, particulate and chemical exposure can degrade edge connectors on backplane-mounted I/O modules, leading to intermittent faults that mimic process recipe errors. Signal isolation modules and analog input cards associated with pressure transducers and temperature sensors in the gas panel are also worth auditing during this window.

Pressure transducers and Baratron gauges installed in the gas delivery manifold upstream and downstream of the filter module should be zeroed and span-checked. A blocked filter creates differential pressure anomalies that can cause these sensors to report out-of-range values, triggering false interlocks. Replacing transducers that have drifted beyond calibration tolerance at the same time as the filter module eliminates a common source of nuisance shutdowns.

Finally, the system HMI and communication modules — including any Ethernet or serial interface cards connecting the process controller to the fab MES — should be confirmed operational after the maintenance event. Vibration from chamber venting and pump cycling during maintenance can loosen communication module connectors, causing intermittent recipe download failures or alarm logging gaps. Confirming HMI touchscreen calibration and controller communication integrity before returning the tool to production is a standard best practice for C3 Vector platforms.

Site Replacement Workflow

Step 1 — Isolation and Lockout/Tagout: Follow your site LOTO procedure for the affected PECVD chamber. Vent the gas panel to a safe state, purge process lines with inert carrier gas, and confirm zero-energy state on all RF, DC bias, and heater circuits before opening any gas-wetted connections.

Step 2 — Filter Module Removal: Locate the 16-167627-00 filter module in the gas delivery manifold. Note the inlet/outlet orientation before disconnection. Use appropriate VCR or Swagelok tooling as specified in the Novellus C3 Vector maintenance manual. Cap all open fittings immediately to prevent contamination ingress.

Step 3 — Inspection of Adjacent Components: Before installing the replacement unit, inspect upstream and downstream fittings, tubing, and valve bodies for particulate accumulation, corrosion, or seat damage. Replace any suspect components identified during this inspection to avoid a repeat maintenance event.

Step 4 — Installation of Novellus 16-167627-00 Replacement: Install the new filter module in the correct orientation. Torque all fittings to OEM specification. Perform a helium leak check on all disturbed connections before restoring gas flow.

Step 5 — System Restore and Verification: Restore gas panel to operational state. Run a process qualification recipe to verify deposition rate, uniformity, and film properties are within specification. Log the replacement in your CMMS with the NINERMAS part number, serial number, and 12-month warranty start date.

This workflow supports a typical replacement time of under four hours for a trained process technician, minimizing the impact on fab scheduling and wafer throughput commitments.

Spare Parts Support FAQ

Q1: Is the Novellus 16-167627-00 compatible with all C3 Vector chamber configurations?
The 16-167627-00 is the standard ruggedized filter module for the Novellus C3 Vector PECVD platform. Compatibility should be confirmed against your specific chamber BOM revision. Cross-reference SKUs 16-273491-00 and 8122 410 05002 may apply to specific sub-configurations. NINERMAS technical support can assist with compatibility verification prior to order placement.

Q2: What pre-shipment testing does NINERMAS perform on this spare part?
All Novellus 16-167627-00 units shipped by NINERMAS undergo visual inspection, dimensional verification, and functional integrity testing prior to dispatch. Each unit is packaged in anti-static, cleanroom-compatible packaging with a test record. The 12-month warranty covers manufacturing defects and functional failure under normal operating conditions from the date of shipment.

Q3: Can NINERMAS support long-term or blanket purchase agreements for this part?
Yes. NINERMAS maintains reserved inventory programs for end-of-life and hard-to-source Novellus spare parts. Maintenance teams and procurement engineers managing multi-tool fleets can negotiate long-term supply agreements to ensure consistent lead times and price stability. Contact sale@ninermas.com to discuss volume and reservation options.

Q4: What is the recommended replacement interval for the 16-167627-00 filter module?
Replacement interval depends on process chemistry, gas flow rates, and fab environment cleanliness. As a general guideline, filter modules in high-utilization PECVD chambers should be inspected at every 500-hour PM interval and replaced at the first sign of differential pressure increase, particulate excursion, or visual contamination. Maintaining one spare unit on-site per active chamber is the recommended inventory posture for uninterrupted production.

Product Series

Other series

Catalog Continuation

More NOVELLUS modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack