Original Industrial Spare Part
GE DS6800CCID1D1D Service-Ready Spare Part for Industrial Maintenance
Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.
RFQ Ready
- SKUDS6800CCID1D1D
- CategoryPLC & Industrial Automation Modules
- BrandGE
- SupportAvailability, lead time, condition, and shipping coordination
How Buyers Usually Use This Page
- Confirm the exact part number and platform family before sending the quote request.
- Use direct email when quantity, condition, and destination are already defined internally.
- Switch to the broader brand or category archive when you need alternates nearby.
Series Navigation
Move through the most common platform families behind this part.
Product RFQ
Send this part directly for quotation.
Include quantity, required condition, destination country, and target delivery timing. Current reference: GE DS6800CCID1D1D Service-Ready Spare Part for Industrial Maintenance with SKU DS6800CCID1D1D.
GE DS6800CCID1D1D Service-Ready Spare Part for Industrial Maintenance
The GE DS6800CCID1D1D is a ruggedized PC board module engineered for continuous operation in demanding industrial environments. Designed as a core component within GE’s Mark VI turbine control platform, this board module plays a critical role in signal processing, I/O management, and system communication integrity. For maintenance engineers managing gas turbine control cabinets, power generation facilities, or heavy process industries, keeping a verified spare of the DS6800CCID1D1D on hand is a fundamental element of any proactive downtime-reduction strategy.
Unplanned outages caused by board-level failures in turbine control systems can result in significant production losses. The DS6800CCID1D1D is a high-demand replacement component precisely because its failure mode — often manifesting as erratic I/O behavior, communication faults, or complete loss of control signal — can bring an entire production line or generation unit to a halt. Sourcing a service-ready, tested spare in advance is the most effective way to compress mean time to repair (MTTR) and restore operations quickly.
At NINERMAS, every DS6800CCID1D1D unit is inspected, function-tested, and shipped with a 12-month warranty, giving procurement engineers confidence in both quality and long-term supply continuity.
Spare Maintenance Table
| Parameter | Details |
|---|---|
| Part Number / SKU | DS6800CCID1D1D |
| Brand / Manufacturer | GE (General Electric) |
| Series / Platform | Mark VI Turbine Control System |
| Product Type | Ruggedized PC Board Module |
| Primary Function | I/O signal processing, system communication, control logic support |
| Form Factor | Plug-in board module (rack-mounted) |
| Operating Environment | Harsh industrial environments; vibration, temperature, and EMI resistant |
| Compatibility | GE Mark VI control cabinets; compatible with associated Mark VI I/O and communication modules |
| Installation | Direct board replacement; follow GE Mark VI maintenance procedures for slot alignment and firmware verification |
| Origin | USA |
| Condition | Original / Service-Ready (inspected and function-tested) |
| Warranty | 12 Months |
| Lead Time | In-stock; same-day or next-day dispatch available |
| Shipping | Worldwide; ESD-safe anti-static packaging |
Maintenance Planning for Continuous Operation
When replacing the DS6800CCID1D1D in a GE Mark VI control cabinet, a thorough site inspection should extend beyond the board itself. Maintenance engineers are strongly advised to simultaneously evaluate the condition of adjacent components that share the same electrical environment and are subject to similar aging and stress cycles.
Begin with the Mark VI power supply modules (such as the IS200EPCTG1A or equivalent PPDA/PPDB power boards) that feed the control rack — a degraded power rail is a common root cause of board-level failures and will damage a replacement module if not addressed. Inspect the terminal board assemblies (e.g., TBCI, TBQC series) connected to the DS6800CCID1D1D for signs of corrosion, loose terminations, or insulation breakdown on field wiring.
Check the I/O modules in adjacent slots — boards such as the IS200VTURH1B or IS200DTURH1B — for fault indicators, as a failing neighbor board can generate misleading diagnostics that implicate the DS6800CCID1D1D. Review the communication modules (IONet or ARCNET interface boards) for packet loss or CRC errors that may have contributed to the original fault condition.
For cabinets with relay output boards (such as the DS200RTBAG1A), verify contact integrity and coil resistance before returning the system to service. Inspect signal isolators and analog input conditioning modules in the same loop to ensure signal fidelity is maintained after the board swap. If the control system interfaces with an HMI or operator workstation via a serial or Ethernet gateway module, confirm communication re-establishment post-replacement.
Procurement engineers building annual MRO budgets should consider stocking the DS6800CCID1D1D alongside complementary Mark VI spare parts — including Mark VI processor boards, VME backplane assemblies, and fuse/protection modules — to ensure a complete cabinet restoration kit is available for emergency scenarios. A well-structured spare parts inventory reduces emergency sourcing lead times from weeks to hours.
Site Replacement Workflow
Step 1 — Isolation & Lockout: Follow site LOTO (Lockout/Tagout) procedures. De-energize the Mark VI control cabinet and verify zero-energy state before opening the enclosure.
Step 2 — Documentation: Record the existing board’s slot position, firmware revision label, and any DIP switch or jumper configurations before removal. Photograph wiring harness connections to the associated terminal board.
Step 3 — Board Removal: Using ESD-safe handling procedures, carefully extract the DS6800CCID1D1D from its VME or proprietary rack slot. Inspect the slot backplane connector for bent pins or contamination.
Step 4 — Replacement Verification: Confirm the replacement DS6800CCID1D1D matches the original part number and hardware revision. Verify firmware compatibility with the site’s Mark VI software version before installation.
Step 5 — Installation & Re-energization: Seat the new board firmly, reconnect all wiring harnesses, and restore power in the correct sequence per GE Mark VI commissioning guidelines. Monitor system diagnostics for fault-free startup.
Step 6 — Functional Test: Perform I/O loop checks, communication verification, and a full control system diagnostic scan before returning the unit to automatic operation. Log the replacement in the site maintenance management system (CMMS).
This structured workflow minimizes re-work risk, protects the replacement module from installation damage, and ensures full system compatibility — reducing total downtime to the shortest possible window.
Spare Parts Support FAQ
Q1: Is the DS6800CCID1D1D compatible with all Mark VI cabinet configurations?
The DS6800CCID1D1D is designed for GE Mark VI turbine control platforms. Compatibility depends on the specific cabinet configuration, firmware revision, and hardware generation at your site. NINERMAS recommends providing your existing board’s full part number and hardware revision when ordering to ensure an exact match. Our technical team can assist with compatibility verification prior to shipment.
Q2: What does the 12-month warranty cover, and how is it supported?
Every DS6800CCID1D1D shipped by NINERMAS carries a 12-month warranty covering manufacturing defects and functional failures under normal operating conditions. Each unit undergoes pre-shipment functional testing. In the event of a warranty claim, NINERMAS provides direct replacement support. Contact sale@ninermas.com with your order reference and fault description to initiate a claim.
Q3: Can NINERMAS support long-term or blanket purchase orders for this part?
Yes. NINERMAS maintains ongoing inventory of high-demand Mark VI spare parts including the DS6800CCID1D1D. We support blanket purchase orders, scheduled releases, and consignment arrangements for customers with recurring MRO requirements. Long-term supply agreements help procurement teams lock in pricing and guarantee availability for planned shutdowns and annual maintenance cycles.
Q4: How is the DS6800CCID1D1D packaged and tested before shipment?
Each unit is individually function-tested, inspected for physical integrity, and packed in ESD-safe anti-static bags with foam cushioning inside a rigid outer carton. A test report and inspection certificate are available upon request. Expedited shipping options are available for emergency breakdown situations, with same-day dispatch for in-stock units ordered before the daily cutoff.
| Product Series | Mark VI |
|---|---|
| Country of Origin | US |
Catalog Continuation
More GE modules in the catalog.
Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.
Catalog Continuation
Alternative parts within PLC & Industrial Automation Modules.
Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.
SKU: 4-AXIS BXI4/2-01-B
BERKELEY BXI4/2-01-B Retrofit-Compatible Motion Controller
SKU: METEOR/RGB PCI 571-03
Matrox METEOR/RGB PCI 571-03 Service-Ready Spare Part