Original Industrial Spare Part

GE DS200SLCCG3ACC Mark V Service-Ready Spare Part

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: DS200SLCCG3ACC DS215DENQG3QZZ01A PLC & Industrial Automation Modules GE

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

GE DS200SLCCG3ACC Mark V Service-Ready Spare Part

The GE DS200SLCCG3ACC (cross-reference: DS215DENQG3QZZ01A) is an original spare part designed for the GE Mark V Speedtronic turbine control system — one of the most widely deployed gas turbine control platforms in power generation, oil & gas, and heavy industrial facilities worldwide. As aging Mark V systems continue to operate beyond their original design life, maintaining a reliable inventory of service-ready boards such as the DS200SLCCG3ACC is critical to preventing unplanned shutdowns and protecting production continuity.

At NINERMAS, every DS200SLCCG3ACC unit is sourced from verified supply channels, subjected to pre-shipment functional testing, and backed by a 12-month warranty. Our long-term spare parts program ensures consistent availability for maintenance teams managing multi-unit turbine fleets or single-site critical assets.

Spare Maintenance Table

Parameter Specification / Detail
Part Number DS200SLCCG3ACC
Cross Reference DS215DENQG3QZZ01A
Brand GE (General Electric)
Series Mark V Speedtronic Turbine Control
Product Type Sequence Logic Control / Communication Card
Compatible Systems GE Mark V, Mark V LM, Mark VIe (adapter-dependent)
Application Gas turbine control, power generation, compressor stations, oil & gas
Operating Voltage +5 VDC / ±15 VDC (rack-supplied)
Form Factor VME-style plug-in board
Mounting Mark V , , controller rack
Operating Temperature 0°C to +60°C (industrial enclosure rated)
Condition Original / Tested Surplus
Pre-Shipment Testing Functional test performed before dispatch
Warranty 12 Months from date of shipment
Lead Time In-stock: 1–3 business days; Long-term supply available
Origin United States

Maintenance Planning for Continuous Operation

When a DS200SLCCG3ACC failure is identified during routine inspection or fault diagnostics, the replacement workflow rarely ends with a single board swap. The Mark V architecture distributes control logic across multiple interconnected cards, and a fault in the sequence logic or communication layer often signals stress on adjacent components. Maintenance engineers should treat this replacement as an opportunity to audit the broader control cabinet.

Begin with the DS200TCQAG1A or DS200TCQCG1A (TMR voting and I/O terminal boards), which interface directly with the SLCC card and are subject to the same thermal and vibration stresses. Inspect the DS200SDCCG1A (servo drive control card) if the turbine has experienced speed control anomalies alongside the logic fault. The DS200IOCAG1A I/O controller board should be checked for contact wear and connector integrity, particularly in high-cycle start-stop applications.

Power supply integrity is equally critical. The DS200PCCAG1A power conditioning card and associated DS200DCFBG1A DC feedback board should be tested for output stability — voltage ripple on the +5 VDC rail is a known contributor to intermittent SLCC faults. Fuse blocks and terminal strips within the controller rack should be inspected and replaced if discoloration or heat damage is observed.

For sites running the Mark V in a TMR (Triple Modular Redundant) configuration, all three controller racks — <R>, <S>, and <T> — should be audited simultaneously. A mismatch in firmware revision or hardware generation between racks can introduce voting discrepancies that trigger nuisance trips. Verify that the replacement DS200SLCCG3ACC matches the existing rack’s hardware revision level before installation.

Communication integrity should also be reviewed. The DS200DSPCH1A or equivalent communication interface card handles inter-rack and HMI data exchange; degraded communication links are frequently misdiagnosed as logic card failures. If the site uses a Cimplicity HMI or third-party SCADA interface, confirm that the replacement board’s firmware is compatible with the existing communication protocol stack.

Finally, review the condition of the DS200TBCBG1A terminal board connectors and any associated signal isolation modules in the I/O marshalling cabinet. Corroded or loose field wiring connections can cause recurring board failures if not addressed during the replacement outage. Procurement teams should consider stocking a minimum of one spare DS200SLCCG3ACC per turbine unit, alongside matched spares for the power conditioning and I/O interface layers, to support rapid recovery from future faults.

Site Replacement Workflow

Step 1 — Fault Confirmation: Retrieve the Mark V diagnostic fault log via the controller HMI or Cimplicity workstation. Confirm that the DS200SLCCG3ACC is the primary fault source and not a downstream symptom of a power supply or communication failure.

Step 2 — Safe Isolation: Follow site-specific LOTO (Lockout/Tagout) procedures. The Mark V rack must be de-energized before board removal. Note the board’s slot position and cable routing before disconnection.

Step 3 — Hardware Verification: Compare the replacement DS200SLCCG3ACC hardware revision and firmware label against the removed unit. Confirm compatibility with the existing rack configuration. For TMR systems, cross-check against the and racks.

Step 4 — Installation & Re-energization: Seat the board firmly in the VME rack, reconnect all cables in the original routing, and re-energize the controller. Monitor the HMI for fault clearance and confirm that all I/O channels report correctly.

Step 5 — Functional Test: Perform a controlled start sequence or simulation test per the site’s commissioning procedure. Verify turbine speed control, protection relay outputs, and communication link status before returning the unit to service.

Step 6 — Documentation: Record the replacement in the site maintenance log, including the removed board’s serial number, fault history, and the replacement unit’s NINERMAS shipment reference and warranty start date.

Spare Parts Support FAQ

Q1: Is the DS200SLCCG3ACC compatible with both Mark V and Mark V LM systems?
The DS200SLCCG3ACC is primarily designed for the standard GE Mark V Speedtronic platform. Compatibility with the Mark V LM (aeroderivative) variant depends on the specific rack configuration and firmware revision. We recommend providing your turbine serial number and existing board revision for compatibility confirmation before ordering. Our technical team can cross-reference against known compatible configurations.

Q2: What testing is performed before shipment?
Every DS200SLCCG3ACC unit shipped by NINERMAS undergoes pre-shipment functional testing to verify board-level operation, communication interface integrity, and power rail response. Test records are available upon request. Units are packed in anti-static ESD-safe packaging with humidity indicators to protect against transit damage.

Q3: What does the 12-month warranty cover, and how is a claim processed?
The 12-month warranty covers manufacturing defects and functional failures under normal operating conditions from the date of shipment. It does not cover damage resulting from incorrect installation, overvoltage events, or physical mishandling. To initiate a warranty claim, contact NINERMAS with the shipment reference number, fault description, and site installation records. Replacement or repair will be arranged within the agreed lead time.

Q4: Can NINERMAS support long-term or blanket purchase orders for DS200SLCCG3ACC?
Yes. NINERMAS operates a long-term spare parts supply program specifically designed for industrial facilities managing aging GE Mark V fleets. We support blanket purchase orders, scheduled delivery programs, and consignment stock arrangements. For multi-unit sites or EPC contractors requiring guaranteed availability over a 12–36 month horizon, please contact our procurement team to discuss a dedicated supply agreement.

Product Series

Mark V

Country of Origin

US

Catalog Continuation

Likely Mark VI / VIe platform matches.

These parts are closer to the same platform family signaled by the current SKU and title, so buyers can validate continuity before sending a final RFQ.

Open this lane

Catalog Continuation

Nearby part numbers around DS200SLC.

Use this lane when the buyer is comparing adjacent model numbers, revision-near items, or closely related spare variants within the same brand family.

Open this lane

Catalog Continuation

More GE modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack