Original Industrial Spare Part

GE DS200TCCBG1AKC Service-Ready Spare Part for Industrial Maintenance

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: DS200TCCBG1AKC PLC & Industrial Automation Modules GE

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

GE DS200TCCBG1AKC Service-Ready Spare Part for Industrial Maintenance

The GE DS200TCCBG1AKC is a ruggedized termination board module engineered for the GE Speedtronic Mark V turbine control system — one of the most widely deployed gas and steam turbine control platforms in power generation, oil & gas, and heavy industrial facilities worldwide. As a critical interface component within the DS200 series architecture, the DS200TCCBG1AKC provides the structured I/O termination layer between field instrumentation and the core control processors, enabling reliable signal routing under demanding environmental conditions including high vibration, wide temperature ranges, and electrically noisy plant environments.

For maintenance engineers managing aging Mark V systems, sourcing a verified, service-ready DS200TCCBG1AKC is often the fastest path to restoring turbine availability after an unplanned trip or scheduled outage. Downtime on a gas turbine train can cost tens of thousands of dollars per hour in lost generation or process output. Having this board available in your on-site spare parts inventory — or confirmed with a trusted supplier — is a fundamental element of any turbine maintenance strategy.

At NINERMAS, every DS200TCCBG1AKC unit undergoes pre-shipment functional testing and visual inspection before dispatch. Units are sourced from verified industrial channels, and each board ships with a 12-month warranty covering manufacturing defects and functional failures under normal operating conditions. Long-term supply programs are available for facilities requiring committed stock agreements across multi-year maintenance cycles.

Spare Maintenance Table

Parameter Specification / Detail
Part Number DS200TCCBG1AKC
Manufacturer GE (General Electric)
Series DS200 / Speedtronic Mark V
Module Type Ruggedized Termination Board
Application Gas & Steam Turbine Control, Power Generation, Oil & Gas
Operating Environment High vibration, wide temperature range, electrically noisy industrial plant
Interface Field I/O termination to Mark V control processors
Compatibility GE Speedtronic Mark V control panels; DS200 series backplane architecture
Installation Panel-mount; compatible with standard Mark V cabinet form factor
Condition Original spare / refurbished-tested (pre-shipment functional test)
Warranty 12 Months — covers manufacturing defects and functional failures
Lead Time Typically in stock; expedited dispatch available
Long-Term Supply Committed stock programs available for multi-year maintenance contracts
Shipping Global; ESD-safe packaging, insured freight

Maintenance Planning for Continuous Operation

When replacing or inspecting the DS200TCCBG1AKC in a Mark V turbine control cabinet, a disciplined maintenance engineer will not stop at the termination board alone. The DS200 series architecture integrates multiple interdependent modules, and a fault or degradation in one component frequently masks or accelerates wear in adjacent boards. A thorough site inspection should include the following associated components:

The DS200TCQBG1A turbine control board and DS200SDCIG2A servo driver card are commonly co-located in the same Mark V panel and share the same backplane power rails — any voltage irregularity on the termination board’s supply side should prompt inspection of these modules as well. The DS200DSPCH1A digital signal processor card handles core control logic and is sensitive to signal integrity issues that can originate at the termination layer; a degraded DS200TCCBG1AKC can introduce noise or open-circuit conditions that manifest as spurious trips at the DSP level.

Power supply integrity is equally critical. The DS200PCCAG1A power converter card and associated DC bus fusing should be verified during any termination board replacement. Blown fuses or marginal capacitors in the power supply chain are a common root cause of repeated termination board failures. Similarly, the DS200EXPSG1A expander board, if present in the cabinet, should be inspected for connector wear and backplane seating integrity.

On the field wiring side, terminal blocks, cable shields, and grounding continuity at the I/O termination points should be checked. Corroded or loose terminations are a leading cause of intermittent faults that are incorrectly attributed to the board itself. The DS200IOCAG1A I/O controller board and any associated signal isolators in the loop should be verified for correct operation after the DS200TCCBG1AKC is replaced.

For facilities running extended Mark V lifecycles, it is also advisable to maintain spares for the DS200TCDAG1A turbine control diagnostic board and the DS200TCEAG1A excitation control board, as these are frequently required during annual overhaul windows. HMI communication interfaces — including the DS200SLCCG1A serial link controller — should be tested for communication continuity after any termination board swap, as physical disturbance of the cabinet can affect connector seating on adjacent communication modules.

Site Replacement Workflow

Replacing the DS200TCCBG1AKC on-site follows a structured sequence to minimize downtime and ensure system compatibility is maintained throughout the process:

1. Pre-Replacement Verification: Confirm the replacement unit’s part number suffix (G1AKC) matches the installed revision. GE DS200 series boards carry revision codes in the suffix that indicate hardware configuration; installing a mismatched revision can cause compatibility issues with the Mark V panel’s firmware and I/O mapping. Cross-reference the panel’s Bill of Materials or the existing board’s label before proceeding.

2. Safe Isolation: Follow the site’s Lockout/Tagout (LOTO) procedure for the turbine control panel. The Mark V system should be in a safe, non-running state before any board removal. Verify that the turbine is on turning gear or fully shut down and that all relevant control loops are in manual or bypassed mode.

3. ESD Precautions: The DS200TCCBG1AKC contains static-sensitive components. Use a grounded ESD wrist strap and handle the board only by its edges. Place the removed board in an ESD-safe bag immediately upon extraction.

4. Physical Installation: Seat the replacement board firmly into the backplane connector, ensuring all guide pins are aligned. Reconnect all field wiring terminations in the correct sequence, referencing the site’s wiring diagram. Torque terminal screws to specification to prevent loose connections.

5. Post-Installation Functional Check: Power up the panel and verify that the Mark V system recognizes the new board without fault codes. Check all I/O channels associated with the termination board for correct signal levels. Run a loop check on critical instrumentation inputs (speed pickups, thermocouples, pressure transmitters) before returning the turbine to service.

6. Documentation: Record the replacement in the site’s maintenance management system (CMMS), including the new board’s serial number, installation date, and pre-installation test results. Update the spare parts inventory to reflect the consumed unit and initiate a replenishment order to maintain minimum stock levels.

Spare Parts Support FAQ

Q1: Is the DS200TCCBG1AKC compatible with all Mark V panel configurations?
The DS200TCCBG1AKC is designed for the GE Speedtronic Mark V turbine control system within the DS200 series architecture. Compatibility depends on the specific panel revision and I/O configuration. Always verify the full part number suffix against your panel’s Bill of Materials before ordering. NINERMAS technical support can assist with cross-referencing your panel documentation to confirm fitment.

Q2: What testing is performed before shipment?
Every DS200TCCBG1AKC unit dispatched by NINERMAS undergoes pre-shipment functional testing, including power-on verification, connector integrity checks, and visual inspection for physical damage, corrosion, or component anomalies. Test records are available upon request. Units are shipped in ESD-safe, anti-static packaging with insured freight to protect against transit damage.

Q3: What does the 12-month warranty cover, and how is a claim processed?
The 12-month warranty covers manufacturing defects and functional failures under normal operating conditions from the date of shipment. It does not cover damage resulting from incorrect installation, overvoltage events, or physical mishandling. To initiate a warranty claim, contact NINERMAS at sale@ninermas.com with the order reference, installation date, and a description of the failure mode. Replacement or repair will be arranged promptly to minimize your downtime exposure.

Q4: Can NINERMAS support long-term spare parts supply for multi-year maintenance programs?
Yes. NINERMAS offers committed stock programs for facilities requiring guaranteed availability of DS200 series components across extended maintenance cycles. These programs include reserved inventory, fixed lead-time agreements, and priority dispatch for emergency requirements. Contact our procurement team to discuss a tailored long-term supply arrangement aligned with your annual overhaul schedule and lifecycle extension strategy.

Product Series

Mark V

Country of Origin

US

Catalog Continuation

Nearby part numbers around DS200TCC.

Use this lane when the buyer is comparing adjacent model numbers, revision-near items, or closely related spare variants within the same brand family.

Open this lane

Catalog Continuation

More GE modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack