Original Industrial Spare Part

Waters M951834CC1-S Retrofit-Compatible Lockspray Flange Assy

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: M951834CC1-S PS-OUTPUT4, 350-0015-01 830-0012-01 830-0002-01 PLC & Industrial Automation Modules Waters

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

Waters M951834CC1-S Retrofit-Compatible Lockspray Side Flange Assembly for Legacy Mass Spectrometry Systems

The Waters M951834CC1-S-PS-OUTPUT4 Lockspray Side Flange Assembly is a precision-engineered replacement component designed to support seamless retrofit and upgrade operations on legacy Waters mass spectrometry platforms. As analytical laboratories and industrial quality-control environments face increasing pressure to extend the operational life of existing instrumentation, sourcing verified replacement assemblies for discontinued or aging source components has become a critical part of maintenance planning. This Lockspray Side Flange Assembly addresses that need directly, offering a retrofit-compatible solution that preserves original system geometry, spray geometry alignment, and electrospray ionization performance without requiring full source replacement or platform migration.

The M951834CC1-S-PS-OUTPUT4 is engineered to interface with the Lockspray reference sprayer system found across multiple Waters UPLC-MS and tandem MS configurations. Lockspray technology provides a continuous reference compound infusion channel alongside the analytical sample spray, enabling real-time mass accuracy correction during acquisition. Maintaining the mechanical integrity of the flange assembly is therefore essential not only for source vacuum integrity but also for the accuracy and reproducibility of mass calibration data. A worn, cracked, or misaligned flange can introduce spray instability, vacuum leaks, and calibration drift — all of which directly impact data quality and regulatory compliance in GMP and GLP environments.

Each unit supplied by NINERMAS COMPANY LIMITED undergoes pre-shipment functional inspection and dimensional verification to confirm compatibility with the target platform prior to dispatch. A 12-month warranty is provided from the date of delivery, covering manufacturing defects and dimensional non-conformance. Reserved inventory is maintained to support urgent replacement requirements and to mitigate lead-time risk for customers operating in continuous production or regulated analytical environments.

Upgrade Compatibility Table

Parameter Specification / Compatibility Note
SKU / Part Number M951834CC1-S-PS-OUTPUT4 | 350-0015-01 | 830-0012-01 | 830-0002-01
Brand Waters Corporation
Component Type Lockspray Side Flange Assembly
Compatible Platforms Waters Xevo TQ-S, Xevo TQ-XS, Xevo G2-XS QTof, Synapt G2-Si, Acquity UPLC-MS systems with Lockspray source
Interface / Mounting Side-entry flange mount; aligns with standard Waters ESI/Lockspray source block geometry
Spray Geometry Maintains original Lockspray reference channel alignment; no recalibration of spray angle required post-installation
Communication / Protocol Not applicable (mechanical/fluidic component); compatible with MassLynx software-controlled source configurations
Installation Space Drop-in replacement; no source housing modification required for standard Lockspray-equipped platforms
Retrofit Recommendation Suitable for direct replacement of worn or damaged OEM flange assemblies; verify O-ring seating and cone alignment post-installation
Commissioning Notes Perform source vacuum leak check, reference compound flow verification, and mass calibration after installation
Warranty 12 months from delivery date; covers manufacturing defects and dimensional non-conformance
Pre-Shipment Testing Dimensional inspection and functional verification completed prior to dispatch

Retrofit Planning for Existing Automation Systems

Planning a successful retrofit around the M951834CC1-S-PS-OUTPUT4 requires a systematic review of the surrounding source assembly and fluidic infrastructure. In most legacy Waters MS installations, the Lockspray flange assembly works in conjunction with several interdependent components that should be assessed simultaneously to avoid repeat downtime events.

The Waters 700005525 ESI Probe Assembly is frequently evaluated alongside the flange during source overhauls, as probe tip condition and alignment directly affect spray stability and ionization efficiency. Similarly, the Waters 700002645 Baffle Assembly governs ion transmission geometry within the source housing and should be inspected for contamination or mechanical wear whenever the flange is replaced. The Waters 700005090 Cone Gas Nozzle controls the desolvation gas flow path and is a common wear item in high-throughput environments; replacing it concurrently with the flange assembly reduces the risk of residual contamination affecting post-retrofit performance.

For systems where the reference compound delivery line has been in service for extended periods, the Waters 289001525 Reference Probe should be inspected for blockage or corrosion. Blockage in the reference channel is a leading cause of mass accuracy drift in Lockspray-equipped systems and is often misdiagnosed as a calibration software issue. The Waters 700002764 Sample Cone and Waters 700003860 Ion Block Assembly are additional components that experience progressive wear in high-matrix sample environments and are worth including in a comprehensive source rebuild plan.

On the fluidic side, the Waters 186007924 Check Valve is a critical component in the reference compound delivery circuit. A faulty check valve can cause backflow contamination of the reference solution reservoir, leading to inconsistent lock mass signals and failed system suitability tests. Replacing the check valve as part of a planned source maintenance event is a low-cost measure that significantly reduces the risk of unplanned downtime.

For installations where the source housing itself has accumulated significant contamination or mechanical stress, the Waters 205000710 Source Heater should be tested for resistance and heating uniformity. Uneven source heating can cause condensation within the source block, leading to electrical shorts and erratic ion signal behavior. Confirming heater integrity before returning the system to service is a standard commissioning step that is often overlooked during rapid replacement operations.

Terminal wiring and power supply connections to the source should also be verified during any flange replacement operation. Confirm that the source power supply output voltage is within specification and that all connector pins are free of oxidation or mechanical damage. Loose or corroded connections at the source interface can cause intermittent signal loss that is difficult to diagnose without a systematic electrical inspection.

Downtime Control During System Migration

Minimizing analytical downtime during a Lockspray flange replacement requires advance preparation and a structured commissioning sequence. The most effective approach is to pre-stage all replacement components — including the M951834CC1-S-PS-OUTPUT4 flange assembly, replacement O-rings, and any associated source components — before taking the instrument offline. This eliminates the risk of extended downtime caused by missing parts discovered mid-procedure.

Before beginning disassembly, export and archive the current MassLynx instrument method files, tune pages, and calibration data. This preserves the original instrument configuration and provides a reference baseline for post-retrofit performance verification. If the system is operating under a validated method in a regulated environment, document the pre-maintenance instrument state in accordance with the applicable change control procedure.

During disassembly, note the orientation and seating position of the existing flange assembly and all associated O-rings and seals. Photograph the source configuration before removal to provide a reference for reassembly. Clean the source housing interior with appropriate solvent before installing the replacement flange to prevent contamination transfer from the old assembly.

After installation, perform a source vacuum integrity check before applying high voltage. Confirm that the reference compound delivery line is primed and flowing at the correct rate before initiating the lock mass acquisition sequence. Run a standard mass calibration procedure using the appropriate calibration solution for the target mass range and confirm that the lock mass signal is stable and within the specified mass accuracy window before returning the system to analytical use.

For systems supporting continuous production workflows, consider scheduling the replacement during a planned maintenance window and maintaining a pre-tested spare flange assembly in local inventory to enable rapid changeover if an unplanned failure occurs. NINERMAS COMPANY LIMITED supports reserved inventory arrangements for customers with ongoing supply requirements, enabling guaranteed availability of critical spare components without the lead-time uncertainty associated with spot purchasing.

Retrofit Support FAQ

Q1: Is the M951834CC1-S-PS-OUTPUT4 a direct drop-in replacement for the original Waters Lockspray Side Flange Assembly?
A: Yes. The M951834CC1-S-PS-OUTPUT4 is dimensionally compatible with the original OEM specification and is designed for direct replacement without source housing modification. Verify O-ring seating and perform a vacuum leak check after installation before returning the system to service.

Q2: What commissioning steps are required after installing the replacement flange assembly?
A: After installation, perform a source vacuum integrity check, confirm reference compound flow at the correct delivery rate, run a full mass calibration procedure, and verify lock mass signal stability before resuming analytical operation. Document all commissioning steps in accordance with your site’s instrument qualification procedures.

Q3: Does NINERMAS provide pre-shipment testing for this component, and what does the 12-month warranty cover?
A: Yes. Each M951834CC1-S-PS-OUTPUT4 unit undergoes dimensional inspection and functional verification prior to dispatch. The 12-month warranty covers manufacturing defects and dimensional non-conformance from the date of delivery. Warranty claims should be submitted with photographic documentation of the defect and the original dispatch record.

Q4: Can NINERMAS support reserved inventory arrangements for ongoing supply of this component?
A: Yes. NINERMAS COMPANY LIMITED offers reserved inventory programs for customers with recurring or high-volume spare parts requirements. Reserved stock arrangements provide guaranteed availability and predictable lead times, reducing the risk of unplanned downtime caused by spot-market supply shortages. Contact our sales team to discuss your specific inventory requirements.

Product Series

Other series

Catalog Continuation

More Waters modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack