Original Industrial Spare Part

TOSOH QUARTZ 71-00178 RKW24-65R Service-Ready Spare Part

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: 71-00178 RKW24-65R L55ZV1, J2 K210 PLC & Industrial Automation Modules TOSOH QUARTZ

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

TOSOH QUARTZ 71-00178 RKW24-65R Service-Ready Spare Part: Spare Replacement and Downtime Risk Control

The TOSOH QUARTZ 71-00178 RKW24-65R L55ZV1 J2 K210 is a precision quartz component engineered for demanding industrial and semiconductor process environments. As a service-ready spare part sourced directly for maintenance operations, this unit supports rapid field replacement, minimizes unplanned downtime, and sustains the operational integrity of critical process equipment. Whether your facility operates continuous diffusion furnaces, oxidation systems, or high-temperature process chambers, maintaining a verified stock of the 71-00178 RKW24-65R is a foundational element of any proactive maintenance strategy.

TOSOH QUARTZ is a globally recognized manufacturer of high-purity quartz products, supplying components to semiconductor fabs, photovoltaic manufacturers, and specialty industrial process lines. The RKW Series represents a family of quartz ware designed for high-temperature, chemically aggressive environments where dimensional stability, thermal shock resistance, and purity are non-negotiable. The L55ZV1 J2 K210 designation further identifies the specific geometry, material grade, and application configuration of this component, making exact SKU matching essential during procurement and replacement planning.

Spare Maintenance Table

Parameter Specification / Detail
Part Number / SKU 71-00178 RKW24-65R L55ZV1, J2 K210
Brand TOSOH QUARTZ
Series RKW Series
Material High-Purity Synthetic / Natural Fused Quartz
Application Environment High-temperature diffusion, oxidation, CVD, and thermal process chambers
Operating Temperature Up to 1200°C (typical for RKW Series quartz ware)
Chemical Resistance Resistant to HF, HCl, and oxidizing atmospheres at process temperatures
Compatibility RKW24-65R geometry; compatible with standard 200mm and legacy process tube configurations
Origin Japan
Condition Original spare, pre-shipment inspected
Warranty 12 Months from date of shipment
Lead Time Subject to reserved stock availability; contact for committed delivery
Packaging Industrial protective packaging; foam-lined for fragile quartz transport
Maintenance Interval Inspect at each scheduled PM cycle; replace upon visible devitrification, cracking, or contamination

Maintenance Planning for Continuous Operation

Replacing the TOSOH QUARTZ 71-00178 RKW24-65R in a live production environment requires a structured approach that goes beyond swapping a single component. Maintenance engineers and procurement teams should treat this replacement as a trigger for a broader system inspection to prevent cascading failures and ensure the process chamber returns to full specification.

During a scheduled replacement of the 71-00178 RKW24-65R, the following associated components and subsystems should be inspected or replaced as part of the same maintenance window:

  • Quartz process tube and liner (TOSOH QUARTZ RKW Series compatible): Inspect for devitrification, particulate buildup, and micro-cracking. A degraded tube adjacent to a new quartz component will accelerate contamination of the replacement part.
  • Quartz boat and paddle assembly: Verify dimensional integrity and surface cleanliness. Warped or contaminated boats cause uneven wafer loading and thermal non-uniformity.
  • Furnace heating element and thermocouple assembly: Confirm calibration and element continuity. A drifting thermocouple will cause thermal overshoot that shortens quartz component life.
  • Gas injection manifold and quartz nozzle: Check for blockage, deposition buildup, or cracking at the nozzle tip. Restricted gas flow creates localized hot spots that stress quartz ware.
  • O-ring seals and flange gaskets (process tube end caps): Replace elastomeric seals at every major PM interval. Failed seals allow atmospheric ingress, causing oxidation and contamination of the quartz surface.
  • Temperature controller and PID module: Validate setpoint accuracy and ramp rate control. Uncontrolled thermal ramps are a primary cause of quartz thermal shock failure.
  • Mass flow controllers (MFCs) for process gas lines: Verify calibration and zero-drift. Inaccurate gas flow ratios affect deposition uniformity and can introduce corrosive species that attack quartz surfaces.
  • Exhaust scrubber and trap assembly: Inspect for saturation or blockage. A saturated trap can cause back-pressure events that introduce contaminants into the process tube.
  • Wafer transfer robot end-effector: Check for particulate generation or misalignment. Mechanical contact with quartz ware during loading is a common source of chipping and premature failure.
  • Furnace door seal and insulation plug: Inspect for heat damage or compression set. A degraded door seal causes thermal loss and uneven temperature distribution across the quartz tube length.

Procurement engineers should note that the RKW Series quartz components from TOSOH QUARTZ are subject to long lead times when ordered on demand. Establishing a reserved inventory program for the 71-00178 RKW24-65R and its associated quartz ware — including spare process tubes, boats, and nozzles — is strongly recommended for facilities operating multiple furnace systems or running continuous production schedules. A minimum buffer stock of two to three units per active furnace line is a widely adopted industry benchmark for high-utilization semiconductor and solar cell manufacturing environments.

Site Replacement Workflow

The following workflow is designed to guide maintenance engineers through a safe, efficient, and traceable replacement of the TOSOH QUARTZ 71-00178 RKW24-65R L55ZV1 J2 K210, minimizing mean time to repair (MTTR) and ensuring system compatibility is maintained throughout the process.

Step 1 — Pre-Replacement Verification: Confirm the incoming spare part SKU matches exactly: 71-00178 RKW24-65R L55ZV1, J2 K210. Cross-reference the part number against the equipment OEM BOM or maintenance manual. Verify the physical dimensions and geometry against the outgoing component before installation. Do not install a part with a mismatched L-code or K-code designation, as these indicate geometry or material grade differences that affect process performance.

Step 2 — Safe Equipment Shutdown: Follow the furnace OEM lockout/tagout (LOTO) procedure. Allow the furnace to cool to below 100°C before opening the process tube end cap. Quartz components must never be handled at elevated temperatures due to thermal shock risk and personnel safety concerns.

Step 3 — Component Removal and Inspection: Remove the outgoing 71-00178 RKW24-65R using approved quartz handling tools — never use metal tools that can chip or scratch the quartz surface. Document the condition of the removed component (devitrification extent, crack location, contamination type) for maintenance records and failure trend analysis.

Step 4 — Installation of Replacement Part: Install the new TOSOH QUARTZ 71-00178 RKW24-65R using clean-room compatible gloves. Ensure correct seating and alignment per the equipment drawing. Torque all flange fasteners to specification to avoid stress concentration on the quartz body.

Step 5 — System Recommissioning: Perform a controlled thermal ramp-up per the furnace OEM recipe. Run a qualification process cycle before returning the equipment to production. Verify process gas flows, temperature uniformity, and exhaust system performance before releasing the tool to production scheduling.

Step 6 — Documentation and Inventory Update: Record the replacement in the CMMS (Computerized Maintenance Management System) with the new part serial number, installation date, and technician ID. Update the spare parts inventory to trigger a replenishment order for the consumed 71-00178 RKW24-65R unit, maintaining the agreed buffer stock level.

Spare Parts Support FAQ

Q1: Is the 71-00178 RKW24-65R L55ZV1 J2 K210 an original TOSOH QUARTZ component?
Yes. This spare part is sourced as an original TOSOH QUARTZ component. Each unit undergoes pre-shipment dimensional and visual inspection to confirm it meets the manufacturer’s specification for the RKW Series. A 12-month warranty is provided from the date of shipment, covering manufacturing defects and material non-conformance.

Q2: How do I confirm compatibility with my existing furnace system before ordering?
Compatibility verification should be based on three criteria: the full SKU match (71-00178 RKW24-65R L55ZV1, J2 K210), the equipment model and process tube inner diameter, and the OEM BOM reference. If your maintenance documentation references the RKW24-65R geometry and the L55ZV1 J2 K210 material and configuration codes, this part is the correct replacement. For legacy systems where OEM documentation is incomplete, contact our technical team with the equipment model number and process tube dimensions for confirmation.

Q3: What is the recommended inventory strategy for this quartz spare part?
For facilities operating one to three furnace systems, a minimum stock of two units of the 71-00178 RKW24-65R is recommended. For high-utilization lines or facilities with four or more furnaces, a reserved inventory program with committed replenishment cycles is advisable. TOSOH QUARTZ RKW Series components can have lead times of 8–16 weeks when ordered on demand; reserved stock programs eliminate this exposure and support MTTR targets of 4–6 hours for planned maintenance events.

Q4: What does the 12-month warranty cover, and what is the claims process?
The 12-month warranty covers manufacturing defects, dimensional non-conformance, and material failures under normal operating conditions as specified for the RKW Series. It does not cover damage resulting from improper handling, installation errors, thermal shock from non-compliant ramp rates, or chemical exposure outside the specified process parameters. To initiate a warranty claim, contact our support team with the shipment date, part serial number, and a description of the failure mode. Failed components should be retained for inspection. Replacement units are dispatched from reserved stock upon claim approval.

Product Series

Other series

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack