Original Industrial Spare Part
EXPO ETM-IS31-001 Retrofit-Compatible Battery Module
Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.
RFQ Ready
- SKUETM-IS31-001
- CategoryPLC & Industrial Automation Modules
- BrandEXPO
- SupportAvailability, lead time, condition, and shipping coordination
How Buyers Usually Use This Page
- Confirm the exact part number and platform family before sending the quote request.
- Use direct email when quantity, condition, and destination are already defined internally.
- Switch to the broader brand or category archive when you need alternates nearby.
Series Navigation
Move through the most common platform families behind this part.
Product RFQ
Send this part directly for quotation.
Include quantity, required condition, destination country, and target delivery timing. Current reference: EXPO ETM-IS31-001 Retrofit-Compatible Battery Module with SKU ETM-IS31-001.
EXPO ETM-IS31-001 Retrofit-Compatible Battery Module for Legacy Systems
The EXPO ETM-IS31-001 is a retrofit-compatible battery backup module engineered for the IS31 series control platform. As aging distributed control systems (DCS) and programmable logic controller (PLC) installations approach end-of-life, maintaining uninterrupted power to memory retention circuits, real-time clock modules, and volatile RAM becomes a critical priority. The ETM-IS31-001 addresses this challenge directly, offering a verified drop-in replacement path that eliminates the need for full controller replacement and preserves existing program logic, I/O mapping, and HMI screen configurations.
For facilities running legacy IS31 series control cabinets — common in oil and gas processing, chemical batch control, power generation, and water treatment — the ETM-IS31-001 provides a cost-effective, low-risk upgrade that extends system service life by years. NINERMAS maintains ready stock of this module with pre-shipment functional testing and a 12-month warranty on every unit supplied.
Upgrade Compatibility Table
| Parameter | Details |
|---|---|
| Compatible Series | EXPO IS31 Series Battery Backup Systems |
| Module SKU | ETM-IS31-001 |
| Replacement For | IS31 OEM battery module (discontinued / end-of-life) |
| Terminal Wiring | Compatible with existing IS31 terminal block layout; no rewiring required under standard retrofit conditions |
| Backplane Interface | IS31 series backplane slot — confirm slot address before installation |
| Communication Compatibility | Passive power module; no protocol dependency |
| Installation Space | Standard IS31 rack form factor; verify rack depth and clearance |
| Commissioning Notes | Confirm battery charge state after installation; validate RTC and RAM retention under power-cycle test |
| Pre-Shipment Testing | Full functional test performed on every unit |
| Warranty | 12 months from date of shipment |
Retrofit Planning for Existing Automation Systems
Replacing the ETM-IS31-001 battery module is rarely an isolated task. In most IS31 series retrofit projects, the battery module replacement is coordinated alongside a broader review of the control cabinet’s power architecture. Engineers typically assess the IS31 series power supply module to confirm that output voltage and current capacity remain within specification before installing a new battery backup unit. If the existing power supply is marginal, it is common to replace it concurrently to avoid a second maintenance window.
Within the IS31 rack, the battery module works in conjunction with the IS31 CPU module, which relies on battery-backed RAM to retain program data during power interruptions. Before removing the ETM-IS31-001, maintenance teams should confirm that the CPU module’s program has been backed up to an external programming device or engineering workstation. For IS31 installations using a dedicated programming cable connected to a laptop running the IS31 configuration software, this backup step takes only minutes but is essential for protecting years of tuning data and ladder logic.
In control cabinets where the IS31 series coexists with IS31-compatible I/O expansion modules — including digital input modules, analog output modules, and thermocouple input modules — the battery replacement should be scheduled during a planned maintenance window rather than an emergency shutdown. This allows technicians to verify that all I/O module addresses remain intact after the power cycle that accompanies battery replacement.
For sites that have already begun migrating portions of their control architecture to newer platforms, the ETM-IS31-001 is frequently used to stabilize the remaining IS31 nodes while the migration proceeds in phases. In these hybrid environments, IS31 communication modules handling legacy serial protocols such as Modbus RTU or proprietary fieldbus links must remain operational throughout the battery swap. Technicians should confirm that the communication link between the IS31 controller and any connected HMI panels — whether standalone operator terminals or SCADA workstations — remains active before and after the module exchange.
Where IS31 racks are mounted in shared control cabinets alongside signal isolators, relay output modules, and terminal marshalling assemblies, installation space confirmation is mandatory. The ETM-IS31-001 occupies a standard IS31 rack slot; however, adjacent modules and cable harnesses must be checked to ensure the replacement module can be seated and latched without disturbing neighboring wiring.
Downtime Control During System Migration
Minimizing downtime during an ETM-IS31-001 replacement requires careful pre-planning. The most effective approach is to treat the battery module swap as a hot-standby operation where possible: confirm that the IS31 CPU module retains its program in flash memory (if supported by the firmware version installed), so that a brief power interruption during battery exchange does not result in program loss.
Where flash retention is not available, the recommended procedure is to perform a full program upload to the engineering workstation before beginning the swap, then verify the upload checksum against the last known-good backup. This protects the original control logic, PID tuning parameters, alarm setpoints, and I/O scaling values that have accumulated over years of field operation.
During the physical swap, technicians should follow IS31 series ESD handling procedures, as the battery module contains sensitive electronics that can be damaged by electrostatic discharge. After seating the ETM-IS31-001, a controlled power-cycle test should be performed to confirm that the CPU module correctly detects the new battery, that the real-time clock retains its setting, and that all I/O modules resume normal scan cycle operation without fault flags.
For facilities where continuous process control is mandatory, a parallel control strategy — temporarily routing critical control loops through a redundant controller or manual backup station — can reduce the risk window to under 15 minutes for a practiced maintenance team. NINERMAS recommends coordinating the ETM-IS31-001 replacement with your site’s planned turnaround schedule to achieve zero unplanned downtime impact.
Retrofit Support FAQ
Q1: Is the ETM-IS31-001 a direct drop-in replacement for the original IS31 series battery module?
A: Yes. The ETM-IS31-001 is designed as a retrofit-compatible replacement for the original EXPO IS31 series battery backup module. It matches the original form factor, terminal layout, and backplane interface. Under standard retrofit conditions, no rewiring or mechanical modification is required. Customers are advised to confirm the rack slot address and battery connector orientation before installation.
Q2: What commissioning steps are required after installing the ETM-IS31-001?
A: After seating the module, perform a controlled power-cycle test to confirm battery detection by the IS31 CPU module. Verify that the real-time clock retains its setting and that RAM-backed program data is intact. If the system supports a battery status diagnostic register, read the register value to confirm the new module is recognized. Document the installation date for warranty tracking purposes.
Q3: Does NINERMAS perform pre-shipment testing on the ETM-IS31-001?
A: Yes. Every ETM-IS31-001 unit supplied by NINERMAS undergoes full functional testing before shipment, including battery charge verification and terminal continuity checks. Units are shipped with a test report and are covered by a 12-month warranty from the date of shipment. Expedited shipping options are available for urgent maintenance requirements.
Q4: What is the lead time and stock availability for the ETM-IS31-001?
A: NINERMAS maintains ready stock of the ETM-IS31-001 to support urgent spare parts requirements. Standard orders are processed and shipped within 1–3 business days. For large-quantity orders or long-term spare parts programs, please contact our team to discuss stock reservation and scheduled delivery arrangements.
| Product Series | Other series |
|---|
Catalog Continuation
Alternative parts within PLC & Industrial Automation Modules.
Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.
SKU: 2-12V HPM5B6BEA1A1F1S235 QLZ 80 3D80-001918-12 MDC-01A
Power-One HPM5B6BEA1A1F1S235 Retrofit Power Supply for Legacy
SKU: VLB20105 V003048.B02