Original Industrial Spare Part

Lam Research HC-SFS202 Service-Ready Spare Part for Industrial Maintenance

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: 50020R-10 810-002895-232 0041-81423 C2088 HC-SFS202 PLC & Industrial Automation Modules Lam Research

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

Lam Research HC-SFS202 Service-Ready Spare Part for Industrial Maintenance

The Lam Research HC-SFS202 is a ruggedized node rocker valve module engineered for demanding semiconductor fabrication and industrial process environments. As a critical flow-control component within Lam Research etch and deposition platforms, the HC-SFS202 governs gas delivery sequencing, chamber isolation, and process repeatability. When this module fails or degrades, the downstream impact is immediate: process drift, unscheduled downtime, and potential wafer loss. Maintaining a verified, service-ready HC-SFS202 spare in your on-site inventory is a fundamental risk-mitigation strategy for any fab or industrial facility operating Lam Research equipment.

NINERMAS supplies the HC-SFS202 as an original spare part, pre-shipment tested and backed by a 12-month warranty. Each unit is inspected for mechanical integrity, valve actuation response, and seal condition before dispatch. Our long-term supply commitment ensures that procurement engineers can plan ahead, avoiding the extended lead times that often accompany legacy semiconductor components.

Spare Maintenance Table

Parameter Specification / Detail
Part Number / SKU HC-SFS202 | 50020R-10 | 810-002895-232 | 0041-81423 | C2088
Brand / OEM Lam Research
Series HC-SFS Series — Ruggedized Node Rocker Valve
Component Type Rocker Valve Module (Node-Level Gas Control)
Application Environment Semiconductor Etch / CVD / ALD Process Chambers; Harsh-Environment Industrial Gas Systems
Actuation Type Pneumatic / Solenoid-Actuated Rocker Mechanism
Media Compatibility Process Gases (Inert and Reactive); Corrosion-Resistant Wetted Surfaces
Installation Interface Node-Level Manifold Mount; Compatible with Lam Research Gas Panel Architecture
Operating Conditions Cleanroom-Grade; Rated for Elevated Temperature and Corrosive Gas Exposure
Maintenance Interval Inspect at scheduled PM cycles; replace upon actuation anomaly or leak detection
Compatibility Lam Research Kiyo, Flex, Versys, and 2300 Series Process Platforms (verify by system BOM)
Condition Original Spare — Pre-Shipment Tested
Warranty 12 Months from Date of Shipment
Lead Time Subject to stock availability; reserved inventory programs available
Supplier NINERMAS COMPANY LIMITED | sale@ninermas.com | +0086 187 5021 5667

Maintenance Planning for Continuous Operation

Replacing the HC-SFS202 in isolation rarely resolves the root cause of a process excursion. Maintenance engineers should treat this valve module replacement as a trigger for a broader inspection of the gas delivery subsystem and associated control infrastructure. The following components are commonly reviewed in the same maintenance window:

The gas line purge solenoids and pneumatic actuator supply regulators feeding the HC-SFS202 node should be verified for correct supply pressure and leak-free connections. A degraded regulator can cause intermittent valve actuation failures that mimic a faulty HC-SFS202. Similarly, the mass flow controllers (MFCs) upstream of the valve node — such as the Lam Research-compatible MFC assemblies used in Kiyo and Flex platforms — should be checked for drift or zero-offset errors that may have contributed to the original fault condition.

The process module I/O interface board responsible for valve command signals is another critical inspection point. If the HC-SFS202 was receiving intermittent or out-of-spec drive signals, the I/O board may require recalibration or replacement. Alongside this, the node controller PCB and its associated ribbon cable assemblies should be inspected for corrosion, connector wear, or signal integrity issues — particularly in harsh-environment installations where condensation or reactive gas exposure is a factor.

For facilities running Lam Research 2300 Series or Versys platforms, the gas panel manifold block and VCR fittings at the valve node interface should be leak-checked after any valve module swap. The pressure transducers monitoring upstream and downstream of the HC-SFS202 position should also be zeroed and verified against a calibrated reference. Faulty transducer readings can mask valve performance issues and lead to repeat failures.

At the control cabinet level, inspect the 24 VDC solenoid driver power supply for output stability. Voltage sag under load is a common but overlooked cause of valve actuation hesitation. The relay output modules in the PLC or DCS rack that command the HC-SFS202 solenoid should be tested for contact resistance and switching speed. In older installations, these relay modules — often from the same Lam Research control architecture — may be approaching end-of-life and should be included in the annual spare parts review.

Finally, the HMI alarm log and process data historian should be reviewed for any pre-fault signatures: valve cycle count anomalies, pressure deviation trends, or MFC flow instability in the hours preceding the failure. This data supports root-cause analysis and informs the procurement engineer’s decision on whether to increase on-hand stock of HC-SFS202 units or related gas delivery components.

Site Replacement Workflow

Step 1 — Isolation and Lockout: Follow your facility’s LOTO procedure for the affected process module. Purge the gas delivery line to the HC-SFS202 node using the system’s automated purge sequence or manual override. Confirm zero pressure at the valve inlet before proceeding.

Step 2 — Documentation: Record the existing valve module’s part number, serial number (if present), and installation date. Photograph the node assembly and cable routing before disassembly. This documentation supports warranty claims and future maintenance planning.

Step 3 — Module Removal: Disconnect the pneumatic supply line and solenoid connector from the HC-SFS202. Remove the node mounting fasteners per the Lam Research service manual torque specification. Inspect the manifold interface surface for contamination or seal damage.

Step 4 — Replacement Installation: Install the new HC-SFS202 using fresh VCR gaskets or O-rings as specified. Torque fasteners to the manufacturer’s specification. Reconnect the solenoid connector and pneumatic supply. Perform a leak check at the node interface before restoring gas flow.

Step 5 — Functional Verification: Restore control power and command the HC-SFS202 through its full open/close cycle via the HMI or diagnostic interface. Verify actuation response time and confirm no alarm conditions. Log the replacement in the equipment maintenance record.

Step 6 — System Restoration: Resume the process recipe and monitor the first run for pressure stability and MFC flow accuracy. Compare against baseline process data to confirm the replacement has restored normal system performance.

This structured workflow minimizes mean time to repair (MTTR) and reduces the risk of secondary failures caused by improper installation. Facilities that maintain a pre-tested HC-SFS202 spare on-site consistently achieve faster recovery times compared to those relying on emergency procurement.

Spare Parts Support FAQ

Q1: What is the recommended spare parts inventory strategy for the HC-SFS202?
For facilities operating multiple Lam Research process modules, we recommend maintaining a minimum of one HC-SFS202 per tool cluster, with a second unit in regional warehouse stock. Given the component’s role in gas delivery sequencing, a stockout during an unplanned failure can result in extended downtime. NINERMAS offers reserved inventory programs that guarantee allocation of HC-SFS202 units against a forward purchase commitment, eliminating lead-time risk for high-volume users.

Q2: How is compatibility with my specific Lam Research platform confirmed?
Compatibility is verified by cross-referencing the HC-SFS202 part number against your system’s bill of materials (BOM) or the Lam Research service documentation for your platform generation. The SKUs 50020R-10, 810-002895-232, 0041-81423, and C2088 are all associated with the HC-SFS202 and may appear in different platform BOMs. Contact NINERMAS with your tool model and BOM reference for a pre-sale compatibility confirmation.

Q3: What pre-shipment testing is performed on each HC-SFS202 unit?
Each HC-SFS202 supplied by NINERMAS undergoes mechanical actuation testing, solenoid response verification, and visual inspection for seal integrity and connector condition. Units that do not meet acceptance criteria are quarantined and not shipped. A test record is available upon request. All units are shipped with a 12-month warranty covering manufacturing defects and functional failures under normal operating conditions.

Q4: Can NINERMAS support long-term supply of the HC-SFS202 for legacy Lam Research systems?
Yes. NINERMAS specializes in long-term spare parts supply for legacy and end-of-life semiconductor and industrial automation equipment. We maintain sourcing relationships that allow us to fulfill HC-SFS202 orders beyond the OEM’s standard support window. Procurement engineers managing aging Lam Research fleets are encouraged to contact us to discuss multi-year supply agreements and reserved stock arrangements that align with planned maintenance schedules.

Product Series

Other series

Catalog Continuation

More Lam Research modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack