Original Industrial Spare Part

AMAT 0020-23811 Retrofit-Compatible Collimator for Legacy Systems

Verify the part, confirm the platform family, and move straight into quotation with the right commercial details.

SKU: 0020-23811 F940GOT-SBD-H AVB51V-X0007, 1D80-004538-11 ES1D80-004538-11 PLC & Industrial Automation Modules Applied Materials

RFQ Ready

Pricing by RFQ

How Buyers Usually Use This Page

  • Confirm the exact part number and platform family before sending the quote request.
  • Use direct email when quantity, condition, and destination are already defined internally.
  • Switch to the broader brand or category archive when you need alternates nearby.

Series Navigation

Move through the most common platform families behind this part.

AMAT 0020-23811 Retrofit-Compatible Collimator for Legacy Systems

The Applied Materials 0020-23811 Honeycomb Collimator is a precision optical and process component originally designed for legacy CVD and PVD semiconductor deposition platforms. As Applied Materials continues to phase out support for older tool generations, facilities running end-of-life equipment face increasing pressure to source verified retrofit-compatible replacements that maintain process integrity without requiring full chamber or system replacement. The 0020-23811 addresses this need directly — offering a drop-in compatible upgrade path for legacy systems where the original part is no longer available through standard OEM channels.

This collimator is engineered to maintain the angular distribution control required in physical vapor deposition processes, ensuring consistent film uniformity across wafer surfaces. For facilities managing aging 200mm or legacy 300mm platforms, the 0020-23811 provides a validated replacement that preserves deposition geometry without requiring chamber re-qualification from scratch.

Upgrade Compatibility Table

Parameter Details
OEM Part Number 0020-23811
Cross-Reference SKUs ES1D80-004538-11, 1D80-004538-11
Compatible Platform Applied Materials Endura, Centura legacy PVD/CVD chambers
Installation Interface Standard AMAT chamber flange mount; verify bolt pattern against 0020-23810 baseline
Communication / Control No active communication interface; passive process component
Replacement Recommendation Direct retrofit replacement for discontinued OEM supply; pre-shipment tested
Commissioning Notes Verify chamber alignment, target-to-collimator spacing, and process recipe parameters post-installation
Warranty 12-Month Warranty from shipment date

Retrofit Planning for Existing Automation Systems

When planning a retrofit around the 0020-23811, engineers must account for the broader chamber and tool ecosystem. In a typical Endura or Centura platform upgrade, the collimator replacement is rarely performed in isolation. Facilities commonly address adjacent components during the same maintenance window to minimize future downtime exposure.

Power delivery components such as the Applied Materials 0190-09828 RF match network and 0190-35965 DC power supply should be inspected and replaced if showing signs of degradation, as power instability directly affects deposition uniformity that the collimator is designed to control. The 0020-24825 shield kit and 0020-23812 deposition ring are frequently replaced alongside the 0020-23811 to restore full chamber geometry to specification.

For facilities also managing process control upgrades, the chamber controller interface — often running on legacy VME or proprietary AMAT control backplanes — may require attention. Components such as the 0100-09041 I/O board and 0100-76038 process controller card are common retrofit targets in the same tool generation. Where HMI panels have aged beyond support, replacement with compatible operator interface units that retain the original screen layout and alarm logic is strongly recommended to avoid retraining downtime.

Gas delivery and pressure control subsystems, including MFC assemblies such as the 0190-22067 and associated valve manifold blocks, should be verified for calibration and leak integrity before chamber restart following collimator replacement. Vacuum system components — including turbomolecular pump controllers and gate valve actuators — should also be confirmed operational to ensure the chamber reaches base pressure within specification before process qualification.

Wiring and terminal block integrity within the process module enclosure must be verified. Corroded or loose terminations on signal cables connecting the chamber thermocouple inputs, pressure transducers, and interlock circuits are a common source of post-retrofit commissioning failures. Documenting terminal assignments before disassembly and verifying continuity after reassembly is a mandatory step in any structured retrofit procedure.

Downtime Control During System Migration

Minimizing unplanned downtime during a collimator retrofit requires pre-staging all replacement components before the maintenance window opens. For the 0020-23811, this means confirming physical dimensions, flange bolt pattern, and collimator cell geometry against the chamber drawing set before the tool is taken offline. Any dimensional discrepancy discovered after chamber opening will extend the outage significantly.

Original process recipes and chamber qualification data should be archived before work begins. Where the tool control system stores recipe parameters in non-volatile memory on legacy controller cards, a verified backup to an external medium is essential. This protects against data loss if a controller card requires replacement during the same maintenance event.

A structured pre-restart checklist — covering chamber leak check, base pressure verification, thermocouple response confirmation, and interlock functional test — should be completed before any process wafers are introduced. Running a dummy wafer qualification cycle with film thickness measurement at multiple points across the wafer confirms that the retrofit has restored deposition uniformity to within specification before production resumes.

For facilities with limited spare tool capacity, coordinating the retrofit during a scheduled preventive maintenance interval rather than responding to an unplanned failure is strongly preferred. Maintaining a pre-qualified 0020-23811 in bonded inventory eliminates lead time risk and allows the maintenance window to be planned with confidence.

Retrofit Support FAQ

Q: Is the 0020-23811 a direct drop-in replacement for the original Applied Materials part?
A: Yes. The 0020-23811 is manufactured to OEM dimensional and material specifications. It is a direct retrofit replacement for the original part in compatible Endura and Centura platform chambers. Pre-shipment dimensional inspection and functional testing are performed on every unit before dispatch.

Q: What commissioning steps are required after installation?
A: After mechanical installation, verify target-to-collimator spacing against the chamber drawing, perform a full chamber pump-down and leak check, confirm base pressure is within specification, and run a process qualification wafer before returning the tool to production. Recipe parameters do not typically require adjustment for a like-for-like collimator replacement.

Q: Do you hold stock for immediate shipment?
A: Yes. The 0020-23811 is maintained in ready-to-ship inventory to support urgent retrofit and breakdown recovery requirements. Standard lead time for in-stock units is 1–3 business days to most destinations. Contact our team to confirm current availability and reserve units for planned maintenance windows.

Q: What warranty coverage applies to this part?
A: All units are covered by a 12-month warranty from the date of shipment. The warranty covers manufacturing defects and dimensional non-conformance. Each unit ships with a pre-shipment test report confirming dimensional inspection results.

Product Series

Legacy

Country of Origin

US

Catalog Continuation

More Applied Materials modules in the catalog.

Use the brand lane to compare nearby part numbers, platform-adjacent modules, and other inquiry-ready listings before sending your final RFQ.

Open this lane

Catalog Continuation

Alternative parts within PLC & Industrial Automation Modules.

Stay inside the same system family when you need substitutes, adjacent modules, or a broader shortlist for procurement review.

Open this lane

Industrial RFQ Support

Need a fast quote for a specific part number or system family?

Send your inquiry with brand, series, quantity, condition, and destination details. We will follow up on availability, lead time, and shipping options.

CallPhone MailEmail WAChat TopBack